Gigafactory

Engineered for scale. CMBLU Energy’s battery storage system is built to scale across industries and applications. Our infrastructure is capital efficient, safe and already in operation.
It is far more capital efficient than lithium batteries, as our safer technology doesn’t require wet rooms or high ramp-up costs.

Our standardised machines are inspired by German automotive efficiency, resulting in low scrap.

CAPEX

Solid Flow

~ $ 15 million per GWh

Lithium

~ $ 100 million per GWh

From Lab

To Fab

We cover all the end-to-end research and manufacturing to create SolidFlow batteries. CMBLU hosts Europe's largest non-lithium energy storage lab.

Global Reach

We are working in multiple jurisdictions, creating the energy storage infrastructure to support over 10 GWh gobally both on and off-grid by 2029.

Gigafactory Germany

Status:

Live since 2024

Current Capacity:

1 GWh

Max Output:

4 GWh

Gigafactory USA

Status:

Planning

Planned Launch:

2029

Max Output:

4 GWh

Gigafactory Greece

Status:

Under Construction

Planned Launch:

2027

Max Output:

4 GWh

Our Gigafactory in Alzenau

Our headquarters is an operational gigafactory site in Alzenau with an output capacity of 1 GWh ready for commercialization. We do everything from designing the right chemical mixtures to assembling the final modules on-site.

Our headquarters is an operational gigafactory site in Alzenau with an output capacity of 1 GWh ready for commercialization. We do everything from designing the right chemical mixtures to assembling the final modules on-site.

Our headquarters is an operational gigafactory site in Alzenau with an output capacity of 1 GWh ready for commercialization. We do everything from designing the right chemical mixtures to assembling the final modules on-site.

Our headquarters is an operational gigafactory site in Alzenau with an output capacity of 1 GWh ready for commercialization. We do everything from designing the right chemical mixtures to assembling the final modules on-site.

Our headquarters is an operational gigafactory site in Alzenau with an output capacity of 1 GWh ready for commercialization. We do everything from designing the right chemical mixtures to assembling the final modules on-site.